Completed in 2020, this scope included the replacement of our client’s centrifuge system. Prior to work being completed, a large fan and associated duct work needed to be relocated. The scope included the replacement of the concrete floor, reinforcement of existing structural steel components, and installation of a new overhead crane. Once these items were complete, two centrifuges were installed and commissioned by our crews.