This project scope included the construction and conversion of an existing refrigeration plant on a hoist cooling system. The mechanical portion of the overhaul required supplying and installing cooling piping and valves, as well as a heat exchanger. Additionally, instrumentation and electrical works were required to ensure proper functionality. After pressure testing and commissioning the system, the project was turned over to the client for operation.